|
ESP BOS
System components - guard rail beam, profile A oder B - post SIGMA 100 (1,90 ms) and post C-125 (2,00 ms) - open box beam and deformation elements - fixing materials
Construction ESP BOS = Containment Level: N2, Working Width: W 3, Impact Severity Level(ASI): B
Field of application Poles, singular trees and alleys. An application is possible if the point of danger is located 60 cm or more from the roadedge.
|